• 论文
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
神东矿区立体帷幕注浆精准堵漏风与高效防灭火技术
  • Title

    Technology of stereoscopic curtain grouting for accurate air leakage plugging and efficient fire prevention and extinguishing technology in Shendong Mining Area

  • 作者

    贺兵兵王青祥许亚优于永宁杨英兵何铖茂马驰骋许超王江龙李龙宋小林

  • Author

    HE Bingbing;WANG Qingxiang;XU Yayou;YU Yongning;YANG Yingbing;HE Chengmao;MA Chicheng;XU Chao;WANG Jianglong;LI Long;SONG Xiaolin

  • 单位

    国家能源集团矿井通风安全与职业健康防护研究中心中国神华能源股份有限公司 神东煤炭分公司中国矿业大学中煤科工集团重庆研究院有限公司中煤科工西安研究院(集团)有限公司

  • Organization
    Research Center on Mine Ventilation Safety and Occupational Health Protection of National Energy Group
    Shendong Mining Branch, China Shenhua Energy Group Co., Ltd.
    China University of Mining and Technology
    China Coal Technology and Engineering Group Chongqing Research Institute
    China Coal Technology and Engineering Group Xi’an Research Institute (Group) Co., Ltd.
  • 摘要

    为高效治理神东矿区浅埋藏煤层开采漏风引起的煤自燃隐患,以大柳塔煤矿活鸡兔井12、12煤层工作面为研究对象,通过立体帷幕注浆的方式进行精准堵漏风与防灭火工程示范。首先利用地质剖面移动角计算注浆距离,并设计注浆平面布置,同时针对不同地质情况,设计了先导钻孔、注浆钻孔和监测钻孔;根据活鸡兔井实际情况,共施工104个钻孔,设计帷幕体长度约1 020 m,高度约40 m;通过分段上行式注浆法,设计工作面切眼外侧注浆高度72 m,12205运输巷段注浆高度12 m,注浆宽度15 m,总注浆169 569.1 m3。通过立体帷幕注浆,12205工作面漏风较同条件下最大减少约1 000 m3/min,12207工作面漏风较同条件下最大减少近800 m3/min;堵漏风效果明显,有效降低12煤层工作面煤自燃隐患。

  • Abstract

    To effectively control the hidden danger of coal spontaneous combustion caused by air leakage in shallow buried coal seam in Shendong Mining Area, taking the upper and lower coal seams of Huojitu Well 12 in Daliuta Coal Mine as the research object, the precision air leakage and fire prevention project demonstration was carried out by means of three-dimensional curtain grouting. The scheme calculates the grouting distance and designs the grouting layout using geological profiles to ensure that the grouting body is not affected by mining activities. Different geological conditions are addressed through the design of pilot boreholes, grouting boreholes, and monitoring boreholes. In accordance with the actual conditions of Huojitu Well, a total of 104 boreholes are constructed, with a curtain body length of approximately 1 020 m and a height of about 40 m. Utilizing the segmented ascending grouting method, the grouting height is set at 72 m for the working face cutting eye of the Well 12 lower coal seam, and 12 m for the 205 coal transport section of the Well 12 upper coal seam, with a grouting width of 15 m. The total grouting volume is estimated at 169 569.1 m3. Through the solid curtain grouting, the air leakage of working face 205 in Well 12 lower coal seam is reduced by about 1 000 m3/min and that of working face 207 in Well 12 lower coal seam is reduced by nearly 800 m3/min compared with the same conditions; the effect of plugging leakage air is obvious, and the hidden danger of spontaneous combustion of coal in the working face of Well 12 coal seams is effectively reduced.

  • 关键词

    神东矿区帷幕注浆堵漏风分段上行式注浆法防灭火

  • KeyWords

    Shendong Mining Area;curtain grouting;blocking air leakage;segmented ascending grouting method;fire prevention and extinguishing

  • 基金项目(Foundation)
    国家自然科学基金资助项目(52104235,52274244);江苏省自然科学基金资助项目(BK20210503); 中国博士后科学基金资助项目(2023T160688)
  • DOI
  • 引用格式
    贺兵兵,王青祥,许亚优,等. 神东矿区立体帷幕注浆精准堵漏风与高效防灭火技术[J]. 煤矿安全,2024,55(9):40−47. DOI: 10.13347/j.cnki.mkaq.20240583
  • Citation
    HE Bingbing, WANG Qingxiang, XU Yayou, et al. Technology of stereoscopic curtain grouting for accurate air leakage plugging and efficient fire prevention and extinguishing technology in Shendong Mining Area[J]. Safety in Coal Mines, 2024, 55(9): 40−47. DOI: 10.13347/j.cnki.mkaq.20240583
  • 相关专题
  • 图表
    •  
    •  
    • 帷幕注浆工程设计图

    图(9) / 表(2)

相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联