• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
济宁城市规划区开采沉陷概率积分法参数综合研究
  • Title

    Comprehensive study of parameters of probability integral method of mining subsidence in urban planning areas of Jining City

  • 作者

    张丰吴志聪张岩谭秀全

  • Author

    ZHANG Feng WU Zhicong ZHANG Yan TAN Xiuquan

  • 单位

    山东省地质矿产勘查开发局鲁南地质工程勘查院,自然资源部采煤沉陷区综合治理工程技术创新中心,中国矿业大学环境与测绘学院

  • Organization
    Lunan Geological Engineering Exploration Institute,Shandong Second Geological Fleet of Bureau of Geology and
    Mineral Exploration and Development Coal Mining Subsidence Area Comprehensive Management Engineering
    Technology Innovation Center,Ministry of Natural Resources School of Environment Science and Spatial
    Informatics,China University of Mining and Technology
  • 摘要

    济宁城市规划区与区内20多个煤矿采区有重叠区域,为掌握济宁城市规划区的开采沉陷规律,为济宁城市规划提供依据 ,在收集整理城市规划区内岱庄矿的观测站资料和13个煤矿的20条观测线资料基础上,综合分析了各矿井概率积分法参数与采深、采高、表土层厚度及充分采动程度的相关性。研究结果表明:研究区域的下沉系数与采动程度、开采深度具有强相关性,即下沉系数随采动程度增大呈现出增大趋势,而随采深增大呈现出减小趋势,且各因子在下沉系数影响程度上表现为表土层厚度>开采深度>开采高度;水平移动系数与表土层厚度、采深、采高和采动程度无明显强相关性。经统计处理得:与表土层厚度在局部上存在二次函数关系;主要影响角正切与表土层厚度在局部上存在线性相关性,并受到开采深度的约束,随采深增大呈现增大趋势,且在局部上与采高存在“波浪”式函数关系;开采影响传播角在本区域比较稳定,处于86.4°~90.0°。




  • Abstract
    There are overlapping areas between Jining designated urban planning area and more than twenty operating production coal mine areas,which plays an important role in mastering the mining subsidence law of the Jining urban planning area and providing a reference for Jining urban planning. The observation station of t he Daizhuang mine in the urban planning area has been collected and sorted,and based on the comprehensive analysis data and the results analysis data of 20 observ ation lines of 13 coal mines,the correlation between the parameters of the probability integration method of each mine and the mining depth,mining height,surface soil t hickness and full mining degree was comprehensively analyzed. The research results show that the subsidence coefficients of the study area has a strong correlation W ith the degree of mining depth and mining degree,that is,the subsidence coefficient shows an increasing trend with the increase of mining depth,and shows a decreasin g trend with the increase of mining depth. In addition,the influence degree of the various factors on the subsidence coefficient is expressed as follows: the thickness of t he surface soil layer>mining depth >mining height. The horizontal movement coefficient does not have distinct relationship with the thickness of the surface soil layer,mi ning depth,mining height and mining degree. But after statistical processing,it is found that there is a local quadratic function relationship with the thickness of the surfa ce soil layer. The main influence is that the angular tangent and the thickness of the surface soil layer have a local linear correlation and are restricted by the mining de pth,showing an increasing trend with the increase of mining depth,and there is a"wave "type functional relationship with the mining height locally.
  • 关键词

    济宁城市规划区开采沉陷概率积分法主成分回归

  • KeyWords

    Jining urban planning; mining subsidence; probability integration methocl; principal component regression;

  • 相关文章
  • 相关专题
  • 图表
    •  
    •  
    • 水平移动系数随各因素关系

    图(4) / 表(0)

相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联