• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
煤矿巷道再造高强度承载结构快速支护技术及工程应用
  • Title

    Rapid support technology and engineering application of roadway reconstruction high strength bearing structure in coal mine

  • 作者

    徐佑林吴旭坤周波郑伟吴少康周泽陈志松张际涛

  • Author

    XU Youlin;WU Xukun;ZHOU Bo;ZHENG Wei;WU Shaokang;ZHOU Ze;CHEN Zhisong;ZHANG Jitao

  • 单位

    贵州理工学院 矿业工程学院南京工业大学 安全科学与工程学院安徽理工大学 矿业学院中国矿业大学(北京)能源与矿业学院贵州大学 矿业学院

  • Organization
    School of Mining Engineering, Guizhou Institute of Technology
    School of Safety Science and Engineering, Nanjing University of Technology
    School of Mining Engineering, Anhui University of Science and Technology
    School of Energy and Mining Engineering, China University of Mining and Technology-Beijing
    Guizhou University, School of Mining
  • 摘要

    针对松软、破碎围岩巷道可锚性差、受强动压和强构造应力影响等问题,开展了大量现场调研并归纳分析了3种典型煤矿巷道围岩大变形和围岩控制难题;在分析现有支护技术和理论基础上,提出再造高强度承载结构快速支护技术思路和再造方法。以贵州龙宝煤矿11205运输下山为工程背景,分析其变形破坏原因,结合实际设计出对破碎围岩进行置换加卸压的联合支护方法,理论上建立巷旁充填墙承载力学模型,分析了巷旁充填墙的承载强度,确定了巷旁充填墙的强度与巷道围岩的可适性及有效性。结合FLAC3D数值模拟与Python脚本编程语言,实现飞蛾火焰优化算法,确定最优的破碎围岩巷道的置换参数(墙体厚度和卸压区宽度)。研发了高强度高韧性充填支护新材料。通过对软弱墙体进行置换再造,让巷道顶板、充填体和底板重新构成一个整体承载结构。井下工业性试验结果表明,对巷道软弱岩体进行置换再造后,巷道顶板、充填体和底板所构成的新结构可实现整体承载,充分发挥了围岩自身承载能力和抵抗变形能力,围岩变形趋于平稳,收敛速率基本都小于0.2 mm/d,无明显变形,且数值模拟计算结果与工程实践监测较为吻合,表明巷旁充填置换支护方案对松软破碎围岩巷道控制有较好的效果。最后,对深入研究再造承载结构快速支护技术进行了展望。

  • Abstract

    In response to the technical challenges of supporting tunnels in loose and fragmented surrounding rock with poor anchorage, strong dynamic pressure, and strong structural stress influences, extensive on-site surveys were conducted, and several typical problems of large deformation in coal mine tunnel surrounding rock and difficulty in rock control were summarized and analyzed. Based on the analysis of existing support technologies and theoretical foundations, a concept and method for the rapid support technology of reconstructing high-strength load-bearing structures were proposed. Taking the 11205 down-hill transport tunnel at Longbao Coal Mine in Guizhou as an engineering background, the causes of deformation and failure were analyzed. A combined support method of displacement and unloading for fragmented surrounding rock was designed in practice. The design plan and optimal parameter calculations for the roadside backfill wall were carried out, and a mechanical model for the load-bearing capacity of the roadside backfill wall was theoretically established. Its load-bearing strength was analyzed to determine the strength of the wall and its suitability and effectiveness with the surrounding rock of the tunnel. By integrating the FLAC3D numerical simulation software and the Python scripting language, the moth-flame optimization algorithm was applied to determine the optimal displacement parameters for the fragmented rock tunnel (wall thickness and unloading zone width). A new material for high-strength, high-toughness backfill support was developed. By displacing and reconstructing the weak wall body, the tunnel roof, backfill, and floor were reconstituted into an integral load-bearing structure. Industrial-scale trial results underground showed that after reconstructing the weak rock body of the tunnel, the new structure consisting of the roof, backfill, and floor fully utilized the surrounding rock’s own load-bearing capacity and resistance to deformation. The rock deformation stabilized, the convergence rate was generally less than 0.2 mm/d, with no significant deformation, and the results of the numerical simulation calculations were consistent with the engineering practice monitoring, indicating that the roadside backfill displacement support scheme has a good effect on controlling tunnels in loose and fragmented surrounding rock. This can provide a theoretical basis for the support and strength parameters of roadside backfill. Finally, the paper looked forward to deeper research into the technology of rapid support for reconstructed load-bearing structures.

  • 关键词

    破碎围岩难支护巷道高强度承载结构承载强度飞蛾火焰优化算法

  • KeyWords

    crushed surrounding rock;difficult supporting roadway;high-strength load-bearing structure;load-bearing strength;moth flame optimization algorithm

  • 基金项目(Foundation)
    国家自然科学基金资助项目( 51764010、51874109),2023年贵州省科技支撑计划(一般项目)资助项目(黔科合支撑[2023]一般305)
  • DOI
  • 引用格式
    徐佑林,吴旭坤,周 波,等. 煤矿巷道再造高强度承载结构快速支护技术及工程应用[J]. 煤炭科学技术,2024,52(2):34−48.
  • Citation
    XU Youlin,WU Xukun,ZHOU Bo,et al. Rapid support technology and engineering application of roadway reconstruction high strength bearing structure in coal mine[J]. Coal Science and Technology,2024,52(2):34−48.
  • 图表
    •  
    •  
    • 受构造影响的难支护巷道现场调研

    图(23) / 表(1)

相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联