• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
钱营孜煤矿W3233工作面过跳采段切顶卸压及围岩控制技术研究
  • Title

    Research on cutting top to relief pressure and surrounding rock control technology passing jump mining section of No.W3233 Face in Qianyingzi Mine

  • 作者

    刘石况开明黄姝羽孙荣言

  • Author

    Liu Shi;Kuang Kaiming;Huang Shuyu;Sun Rongyan

  • 单位

     安徽恒源煤电股份有限公司 钱营孜煤矿中国矿业大学(北京)能源与矿业学院

  • Organization
    Anhui Hengyuan Coal Power Co., Ltd., Qianyingzi Mine
    College of Energy and Mining, China University of Mining and Technology ( Beijing ),Beijing 100083, China
  • 摘要

    在遇到大断层时工作面需要跳采以保证采煤效率,跳采区域巷道受顶板矿压影响,易产生冒顶、片帮等破坏形式,为解决钱营孜煤矿W3233工作面过跳采段巷道支护难题,结合现场工程条件,通过理论分析顶板来压情况,结合相似工程经验,针对跳采区域探煤巷以及W3233风巷留巷部分,提出一种合理预裂爆破切顶方案,研究分析出一套合理的爆破参数,同时对巷道进行加强支护,通过理论分析和FLAC3D有限元分析软件模拟,分析设计支护方案下锚杆索系统产生的预应力场,结果表明巷道附近能形成连续有效高应力区,对围岩体起到加固作用,结合预裂爆破切顶方案,达到理想支护效果。

  • Abstract

     In the face of large faults, the working face needs to jump mining to ensure the mining efficiency. The roadway in the jump mining area is affected by the roof pressure, which is easy to produce roof fall, rib spalling and other failure forms. In order to solve the problem of roadway support in the jump mining section of No.W3233 Face in Qianyingzi Mine, combined with the field engineering conditions, through the theoretical analysis of the roof pressure situation, combined with similar engineering experience, a reasonable pre-splitting blasting roof cutting scheme was proposed for the coal exploration roadway in the jump mining area and the W3233 air roadway retaining part, and a set of reasonable blasting parameters were studied and analyzed. At the same time, the roadway was strengthened and supported. Through theoretical analysis and FLAC3D finite element analysis software simulation, the prestress field generated by the bolt-cable system under the design support scheme was analyzed. The results showed that a continuous effective high stress zone could be formed near the roadway, which played a reinforcing role in the surrounding rock mass. Combined with the pre-splitting blasting roof cutting scheme, the ideal support effect was achieved.

  • 关键词

    跳采切顶卸压爆破参数巷道围岩控制数值模拟预应力分析

  • KeyWords

     jump mining;cutting top to relief pressure;blasting parameters;roadway surrounding rock control;numerical simulation;prestress analysis

  • DOI
  • 引用格式
    刘 石1,况开明1,黄姝羽2,孙荣言2. 钱营孜煤矿W3233工作面过跳采段切顶卸压及围岩控制技术研究[J]. 煤炭与化工, 2024, 47(8): 21-26.
  • Citation
    Liu Shi1, Kuang Kaiming1, Huang Shuyu2, Sun Rongyan2. Research on cutting top to relief pressure and surrounding rock control technology passing jump mining section of No.W3233 Face in Qianyingzi Mine. CCI, 2024, 47(8): 21-26.