• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
河流下综放工作面覆岩破坏特征和陷落柱防水煤柱留设研究
  • Title

    Study on overburden failure characteristics and collapse column waterproof coal pillar design in fully-mechanized top coal caving face under river

  • 作者

    韦四江张林超王猛谭毅

  • Author

    WEI Sijiang;ZHANG Linchao;WANG Meng;TAN Yi

  • 单位

    河南理工大学能源科学与工程学院煤炭安全生产与清洁高效利用省部共建协同创新中心

  • Organization
    School of Energy Science and Engineering,Henan Polytechnic University
    Collaborative Innovation Center of Coal Work Safety and Clean High Efficiency Utilization
  • 摘要
    目的目的长平矿Ⅲ2317工作面在开切巷处揭露陷落柱,地表丹河流向与工作面推进方向一致,受采动影响,陷落柱内部水体及河水可能通过开采裂隙导入回采空间,从而造成工作面突水。针对以上问题,方法方法本文采用理论分析、数值模拟和现场观测等方法,对回采工作面覆岩“两带”高度、覆岩破坏特征和陷落柱煤柱留设宽度进行研究。结果结果结果表明:工作面顶板垮落带与导水裂隙带最大发育高度分别为18.38,93.85m,河水对工作面不构成突水威胁;无煤柱开采时,陷落柱一侧顶板裂隙沿陷落柱胶结面向上高度发育;结合理论计算和数值模拟分析,确定煤柱宽度为35m。工作面在留设35m煤柱条件下安全完成回采,地表变形特征符合预期,最大下沉量达到4000mm,回采过程中工作面未发生突水事故。结论结论研究结果可为类似条件下的煤层安全开采提供理论和经验支撑。
  • Abstract
    Objectives The Ⅲ2317 working face of Changping Cole Mine exposed the SX20 collapse column at the open-off cut. The surface Dan River flows in the same direction as the advancement of the working face. Affected by mining, the water in the collapse column and the river may flow into the working space through the mining fissures, potentially causing water inrushes in the working face. Methods This study in‐vestigated the “two-zone” height of the overburden, overburden failure characteristics, and the width of the collapse column coal pillar using theoretical analysis, numerical simulation, and field observation. Results The results showed that the maximum development heights of the roof caving zone and the water-conducting fissure zone were 18.38,93.85 m, respectively. The Dan River water did not pose a water inrush threat to the working face. When mining without coal pillars, roof damage on the collapse column side developed up‐wards along the cemented face of the collapse column. Combining theoretical calculations and numerical simulations, the coal pillar width was determined to be 35 m. The working face was safely mined with a 35 m coal pillar left in place. Surface deformation characteristics met expectations, with a maximum subsidence of 4 000 mm. No water inrush incidents occurred during the recovery process. Conclusions The research re‐sults could provide theoretical and empirical support for the safe mining of coal seams under similar condi‐tions.
  • 关键词

    水下采煤覆岩破坏特征“两带”高度陷落柱活化防水煤柱

  • KeyWords

    underwater mining;overburden failure characteristic;“two-zone” height;collapse column activa‐tion;waterproof coal pillar

  • 基金项目(Foundation)
    国家自然科学基金资助项目(51974104);河南省科技攻关项目(212102210230);河南省矿产资源绿色开采重点实验室开放基金资助项目(KCF2205)
  • DOI
  • 引用格式
    韦四江,张林超,王猛,等.河流下综放工作面覆岩破坏特征和陷落柱防水煤柱留设研究[J].河南理工大学学报(自然科学版),2024,43(6):1-10.
  • Citation
    WEI S J,ZHANG L C,WANG M,et al.Study on overburden failure characteristics and collapse column waterproof coal pillar design in fully-mechanized top coal caving face under river[J].Journal of Henan Polytechnic University(Natural Science),2024,43(6):1-10.
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联