Outburst Prevention Technology with Borehole Hydraulic Jet Through Strata in Floor Gateway
-
作者
刘明举郭献林李波王冕
-
单位
河南理工大学煤矿安全工程技术研究中心中国矿业大学(北京)资源与安全工程学院
-
摘要
针对新安矿14211运输巷掘进过程中面临的煤与瓦斯突出问题,为了研究和确定适合新安煤田三软煤层赋存特点的水力冲孔工艺和消突评价体系,使其快速消除工作面突出危险性,提高煤巷掘进速度,采用底板巷穿层钻孔水力冲孔防突措施,按照考察出的冲孔影响半径均匀布置钻孔,排出部分煤体和瓦斯,使煤体卸压增透。试验结果表明,底板巷穿层水力冲孔技术较好地适应和利用了三软煤层的赋存特点,消除了工作面的突出危险性,掘进速度也由之前的40 m/月提高到75m/月,提高了87.5%。
-
Abstract
According to coal and gas outburst problems occurred in the heading process of the No. 14211 transportation gateway in XinDan Mine, in order to study
and set up the borehole hydraulic jet technique and the outburst evaluation system suitable for the three soft seam deposit features in XinDan Coalfield, to rapidly elimi
nate the outburst danger of the heading face and to improve the seam gateway heading speed, the outburst prevention measures with borehole hydraulic jet through th
e strata in the floor gateway were applied.According the investigation of the borehole hydraulic jet influence radius, a layout of the borehole pattern was evenly set up a
nd a partial coal and gas could be discharged.Thus the seam pressure could be released and the permeability of the seam could be improved.The experiment result sh
owed that the borehole hydraulic jet technology passed through strata in the floor gateway would be well suitable for and uilization of the deposit features of the three s
oft seam and could eliminate the outburst danger of the heading face.Thus the heading speed could be improved from the previous 40 m/month to 75 m/month and the
heading efficiency was improved by 87.5%.
-
关键词
底板巷穿层钻孔三软煤层水力冲孔防突措施
-
KeyWords
floor gateway;borehole through strata;three soft seam;borehole hydraulic jet;outburst prevention measure;
-