• 论文
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
浅埋近距离房式采空区下应力场分析及动压机理研究
  • Title

    Stress field analysis and study on dynamic pressure mechanism under goaf of shallow depth and closed distance room and pillar mining

  • 作者

    霍丙杰范张磊谢伟段志华路洋波荆雪冬

  • Author

    HUO Bingjie,FAN Zhanglei,XIE Wei,DUAN Zhihua,LU Yangbo,JING Xuedong

  • 单位

    辽宁工程技术大学 矿业学院神东天隆集团有限责任公司

  • Organization
    1.School of Mining, Liaoning Technical University, Fuxin , China;2.Shendong Tianlong Group Company Limited, Ordos ,China
  • 摘要
    针对因房式采空区煤柱留设情况复杂,煤柱底板应力传递相互叠加,周期来压异常,霍洛湾煤矿3-1煤层过上覆2-2煤层房式采空区强矿压及动压现象的问题,应用理论分析、数值计算、相似材料模拟等方法,建立了2-2煤层房式采空区复合煤柱底板传递规律模型,探讨了出煤柱时顶板覆岩结构,揭示了煤柱影响条件下3-1工作面“高应力-煤柱-覆岩运动”联合作用动压机理。研究结果表明:2-2煤层房式采空区大煤柱下的水平与垂直应力较高,达9.7~15.3 MPa;垂直应力影响深度为42~58 m,水平应力影响深度为10~23 m,剪应力波及范围25~50 m;当3-1煤层工作面在20 m或50 m宽煤柱下开采时,超前支承应力较大,应力集中系数高达4.44~5.00;3-1煤层工作面出大煤柱时的动压现象是由上下煤层应力叠加、煤柱上方倒梯形岩柱失稳与顶板垮裂运动联合作用的结果,可指导霍洛湾矿3-1煤层安全开采。
  • Abstract
    According to the complicated condition of the coal pillars left in the room and pillar mining goaf, such as the stress transmission of the coal pillar floor was overlapped, the periodic weighting was abnormal as well as the strong mine rock pressure and dynamic pressure phenomenon when No. 3-1 seam in Huoluowan Mine was passed thought the overburden room and pillar mining goaf in No. 2-2 seam, a theoretical analysis, numerical calculation, similar material simulation and other methods were applied to establish a model of the floor stress transmission law for the complex coal pillar in the room and pillar mining goaf of No. 2-2 seam. The paper had a discussion on the roof overburden structure when the coal pillar was passed and the combined action dynamic pressure mechanism of the "high stress - coal pillar - overburden rock movement" in No. 3-1 coal mining face under the influence condition of the coal pillars was reveal. The study results showed that under the large coal pillars in the room and pillar mining goaf in No.2-2 seam, the horizontal and vertical stresses were high and could research 9.7~15.3 MPa. The influence depth of the vertical stress was 42~58 m, the influence depth of the horizontal stress was 10 ~ 23 m and the shear stress affected scope was 25~50 m. When No.3-1 coal mining face was mining under the coal pillars with a wide of 20 m or 50 m, the advance support stress would be high and the stress concentration coefficient would be 4.44~5.00.When the coal mining face in No. 3-1 seam passed through the above large coal pillars, the dynamic pressure phenomenon would be the stress superposition from the upper seam to the lower seam. The inverted trapezoid rock pillar instability above the coal pillar and the roof collapsed movement combined effect results could guide the safety mining of No. 3-1 seam in Huoluowan Mine.
  • 关键词

    浅埋煤层房式采空区应力场超前支承应力覆岩结构

  • KeyWords

    shallow depth seam; goaf of room and pillar mining; stress environment; advanced support pressure; overburden structure

相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联