• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
五沟煤矿F6断层缩小保护煤柱可行性研究
  • Title

    Feasibility study on reducing protective coal pillar of F6 fault in Wugou Coal Mine

  • 作者

    王道坤牛辉解建胡伟张培森

  • Author

    WANG Daokun;NIU Hui;XIE Jian;HU Wei;ZHANG Peisen

  • 单位

    安徽皖北煤电集团有限责任公司,安徽 宿州 234001山东科技大学 矿业工程国家级实验教学示范中心,山东 青岛 266590

  • Organization
    Anhui Wanbei Coal-electricity Group Co., Ltd.
    Mining Engineering National Experimental Teaching Demonstration Center, Shandong University of Science and Technology
  • 摘要
    针对具体的地质条件,以五沟煤矿F6断层为研究对象,结合研究区域内断层及底板灰岩水的空间分布关系,采用数值模拟及理论分析相结合的方法,对留设不同宽度煤柱时断层的突水危险性进行分析;利用理论计算确定F6断层未处理之前合理的煤柱留设宽度,同时考虑F6断层的三维地震探查成果及井下实揭资料,理论分析了下部含水层的注浆加固范围;综合理论计算及数值模拟计算结果对F6断层煤柱缩小的可行性进行研究,研究结果对于提高五沟煤矿煤炭资源采出率有着重要的意义。
  • Abstract
    According to the specific geological conditions, taking F6 fault of Wugou Coal Mine as the research object, combined with the research of fault and the floor limestone water in the area of space distribution relationship, numerical simulation and theoretical analysis are used to analyze the water inrush risk of different widths of coal pillars, and theoretical calculation is used to determine the reasonable width of coal pillars before F6 fault treatment, at the same time, considering the 3D seismic exploration results of F6 fault and the data of underground excavation, the grouting reinforcement range of the lower aquifer is analyzed theoretically. Combining the results of theoretical calculation and numerical simulation, the feasibility of reducing the coal pillar of F6 fault is studied. The research results have important significance for improving the recovery rate of coal resources in Wugou Coal Mine.
  • 关键词

    五沟煤矿底板突水断层活化煤柱留设宽度注浆加固

  • KeyWords

    Wugou Coal Mine;floor water inrush;fault activation;reserved width of coal pillar;grouting reinforcement

  • 基金项目(Foundation)
    国家重点研发计划资助项目(2018YFC0604702);国家自然科学基金资助项目(51379119);山东省自然科学基金资助项目(ZR2021ME086)
  • DOI
  • 引用格式
    王道坤,牛辉,解建,等. 五沟煤矿F6断层缩小保护煤柱可行性研究[J]. 煤矿安全,2023,54(9):166−173
  • Citation
    WANG Daokun, NIU Hui, XIE Jian, et al. Feasibility study on reducing protective coal pillar of F6 fault in Wugou Coal Mine[J]. Safety in Coal Mines, 2023, 54(9): 166−173
  • 相关文章
  • 图表
    •  
    •  
    • 煤层位于含水层上方且断层不导水时防隔水煤(岩)柱留设图

    图(8) / 表(0)

相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联