摘要
以平朔矿区露天井工协调开采工程实践为背景,采用物理模拟与数值分析相相结合的方法,分析了采动边坡的变形破坏特征与应力分布规律,揭示了"关键硬岩层"与"关键弱层"耦合作用下采动边坡的变形破坏模式与典型失稳机理,提出了采动边坡变形破坏演化的四阶段理论,即表生改造、结构改造、时效变形和最终失稳(稳定),建立工程力学模型,推导出了采动边坡进入时效变形和最终失稳(稳定)阶段的判据。
-
Abstract
Based on the open-pit and underground mining engineering practice in Pingshuo mining area,the physical simulation and numerical analysis were combined to investigate the deformation-failure characteristics and stress distri- bution rule of mining slope. Therefore,the deformation-failure mode and the typical instability mechanism of mining slope under the coupling effects of key hard strata and key weak strata were revealed. A four-stages theory of deforma- tion and destruction of mining slope was put forward,including epigenetic recreation of rockmass structures stage, structure transformation stage,time-dependent deformation stage and eventually unstable (stable) stage. Then the en- gineering mechanics model was established. The criterion of mining slope into the time-dependent deformation stage and eventually unstable (stable) stage were deduced.
-
关键词
露井联采采动边坡关键岩层变形破坏机理动力学过程
-
KeyWords
open-underground mining;mining slope;key strata;mechanism deformation-failure mechanism;dynamic process
-