• 论文
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
浅埋深综采工作面过集中煤柱压架机理分析
  • Title

    Analysis on powered support jammed mechanism of fully-mechanized coal mining face in shallow depth mine pass through over concentrated coal pillar

  • 作者

    李浩荡张彬

  • Author

    Li Haodang Zhang Bin

  • 单位

    神华集团有限责任公司煤炭生产部新疆维吾尔自治区党委全面深化改革领导小组办公室中国矿业大学(北京)煤炭科学技术研究院有限公司安全分院煤炭资源高效开采与洁净利用国家重点实验室

  • Organization
    Coal Production Department,Shenhua Group Corporation Limited Ofice of Fully Deep Reform LeadingGroup,Xinjiang Uygur Autonomous Region Committee of Communist Party of China China University of Mining andTechnology ( Beijing)Safety Branch,China Coal Research Institute Co..Ltd. State Key Laboratory of Coal Mining and Clean Utilization
  • 摘要
    针对我国西部矿区浅埋深近距离煤层过房柱采空区集中煤柱时压架事故频发的问题,以神东矿区石圪台煤矿综采工作面为对象,采用理论分析和数值模拟的方法分析了压架机理。结果表明:受集中煤柱支撑的上覆顶板较为完整,综采工作面进入集中煤柱前和在集中煤柱下,综采工作面顶板压力基本正常,对支架影响不大;当综采工作面推过集中煤柱一段距离后,集中煤柱进入采空区,其状态由弹塑性状态变为完全塑性状态,随下方岩层下沉,发生失稳破坏,并导致其上方顶板岩层的大面积破坏下沉;基本顶无法形成稳定的"铰接岩梁"结构,发生瞬时断裂失稳,形成远大于支架工作阻力的超大动载矿压,将下方综采工作面80%的支架压死。因此,上方悬而未冒的基本顶的失稳切冒且无法形成稳定结构成为大面积、瞬间压架的根本原因。
  • Abstract
    According to the powered support jamned accident frequently occurred when the concentrated coa ilas were inthe goaof the room and pllar miningin the shall w depth and close distance seam in China western mining area, based on the fully mechanized coal mining face in Shigeal Mine of Shendong Mlining Area as the object.the theoreical analysi and the numeical sinulaton method were applied to analyze the powered suppor jammed mechanisom.The resuts showed that wih the suppor of the concenrated oom an illar mining type coal ilas the top seam roof were completed.Before the ruly-mechanized coal minin face was under the areaof the top seam concentrated coa illars and when the coal mining face was under the areaof the top seam concenrated coa oilla area.the rof pressuecf te fally-mechanized coal mining face was normal asically and was less affcted to the powered suppots. Nhen thefrlly-mechanized cal fce was pushed foward andpassed through certain ditance under the concentrated illa area,the goaf of the rll-mechanized mining face was under the concentrated coal ilar area and therof staus would be changed from the elastc -lastic status to the ful astic statu . with the subsidence of the under burden rock.the rock insteailily nd falre were occurred and the large area fallure and subsidence of the top roo strata were ocured. The basic roof could not fom a stable ariculted rock beanm'structure. when the basicro was broken and intability ransiently occured ,a super dynamic mine prssurefar higher than the working res itance of the powered suppot was fomed and jammed the 80 % of the powered supporis aplid in the ully mechanized coal mining face. Therefore,the top suspended and yet notalen basc roof withthe instaility and roof cutting could not form a stable structure and would be the root causes of the large area powered supports jammed 'transiently.
  • 关键词

    集中煤柱压架浅埋深煤层房柱采空区

  • KeyWords

    concentrated coalpillars, powered support jammed; shallow depth seam; goaf of room and pillar mining

  • 基金项目(Foundation)
    国家科技重大专项资助项目(2011ZX05040);国家自然科学基金资助项目(51404139);
  • 相关文章
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联