-
Title
Gas comprehensive control technology of upper protective seam in contiguous outburst seams
-
作者
马国强陈如忠崔刚刘宁宁李磊
-
Author
MA Guo-qiang CHEN Ru-zhong CUI Gang LIU Ning-ning LILei
-
单位
煤炭科学技术研究院有限公司煤炭资源高效开采与洁净利用国家重点实验室北京市煤矿安全工程技术研究中心重庆松藻煤电有限责任公司
-
Organization
China Coal Research Institute Company Limited National Key Lab of Coal Resource High Efficient Mining and Clean
Uitilization Beijing Research Center of Mine Safety Engineering and Technology Chongqing Songzao Coal and
Electric Power Company Limited
-
摘要
针对打通一矿近距离突出煤层群上保护层开采面临的快速消突与瓦斯超限的难题,采用本煤层水力压裂增透,顺层平行钻孔下套管预抽,邻近被保护层底板穿层网格钻孔预抽、卸压抽、残抽,高位钻孔抽采,"U型+尾排"通风方式等瓦斯综合治理技术措施,实现了保护层工作面的快速消突,抽采达标时间缩短了90 d,突出预测指标K1、S从未超标,工作面瓦斯抽采率达到72.07%,彻底解决了回风隅角瓦斯频繁超限难题,保障了矿井采掘接替及工作面安全高效回采。
-
Abstract
According to the rapid outburst elimination and gas content over limit problems faced to the mining in upper protective seam incontiguous outburst seams of
Datong No.1 mine,the mining seam hydraulic fracturing and permeability improvement technology,in seamhorizontal borehole and casing pre-drainage technology,adjacent
protected seam floor passing through cross seam borehole pre-drainage,pressure released drainage,residual drainage technology,high level borehole drainage technology,
U type + tail discharging ventilation modeand other gas comprehensive control technical measures were applied. The rapid outburst elimination of the protective seam face
was real-ized. The gas drainage standard time was reduced by 90 days. The outburst predicted indexK1 andSwas never over the standard. The gasdrainage rate of the coa
| mining face was 72.07%. The gas frequent over limit problem at the air retuning corner was completely solved andthe safety and high efficient mining of the mining and e
xcavation alternation were ensured.
-
关键词
近距离煤层上保护层突出煤层群瓦斯治理采掘接替抽采达标
-
KeyWords
contiguous seams; upper protective coal seam; outburst coal seams; gas control; mining and excavation alternation; drainage up to standard;
-
基金项目(Foundation)
国家科技重大专项资助项目(2011ZX05065-006;2011ZX05041-003-02);