年产千万吨300m长综放工作面开采技术
  • Title

    Mining Technology of 300 m Long Fully-Mechanized Top Coal Caving Mining Face with Annual Production of over 10 Millions Tons

  • 作者

    王振军张忠温

  • Author

    WANG Zhen-jun ZHANG Zhong-wen

  • 单位

    中煤能源集团公司生产技术管理部中煤平朔集团有限公司

  • Organization
    Department of Production and Technology Management, China National Coal Group Corporation China Coal
    Pingshuo Group Company Limited
  • 摘要
    为实现矿井年产千万吨的目标,以平朔井工一矿浅埋深、两硬条件下的特厚煤层为例,介绍了采用国产成套装备为主的300 m长综放工作面安全高效开采技术,结合工作面矿压显现、支架适应性、顶煤冒放性等指标,评价了特厚煤层千万吨300 m长综放工作面安全高效开采效果。结果表明:采用300 m长工作面综放开采的采煤方法,确定割煤高度为3.8 m、放煤高度为8.7 m,通过合理配套工作面设备,工作面平均日产4万t左右,平均月产108万t,最高月产118万t,平均年产1 200万t以上,工作面采出率88.98%,实现了单工作面年产1 000万t以上的目标。
  • Abstract
    In order to realize a target of a mine with an annual production of over 10 million tons, taking a ultra thick seam in Pingshuo No.1 Underground Mine un der the conditions of a shallow mining depth, hard coal and hard roof rock as a case, the paper introduced the safety and high efficient mining technology on a 300 m lo ng fully-mechanized top coal caving mining face mainly with the domestic completed set equipment. In combination with the mine strata pressure behaviors of the coal mining face, powered support suitability, top coal caving and other indexes, the paper evaluated the safety and high efficient mining effect of the 300 m long fully-mecha nized top coal caving mining face with an annual coal production of over 10 million tons in the ultra thick seam. The results showed that with a 300 m long coal mining f ace and the fully-mechanized top coal caving mining method, the cutting height of the coal mining face was set as 3. 8 m and the coal caving height was set as 8.7 m. With the rational matched coal mining face equipment, an average production per day of the coal mining face was about 40 000 tons, the average month production of t he coal mining face was 1. 08 million tons, the max month production was 1.18 million tons, the average annual production was over 12 million tons and the coal minin g recovery rate of the coal mining face was 88.98%. The annual production over 10 million tons from a single coal mining face was realized.
  • 关键词

    特厚煤层浅埋深两硬煤层千万吨工作面300m长综放工作面

  • KeyWords

    ultra thick seam; shallow mining depth; hard coal and hard roof seam; coal mining face with annual production of over 10 mil-lion tons; 300 m long full y-mechanized top coal caving mining face;

  • 基金项目(Foundation)
    国家自然科学青年基金资助项目(51304115);“十二五”国家科技支撑计划资助项目(2012BAK04B08);
  • 相关文章
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联