-
Title
Designed Parameters Calculation Method of Borehole Drilling Through Inclined Seam for Gas Pressure Measuring
-
作者
桑聪潘多伟李伟郭建行
-
Author
SANG Cong PAN Duo-wei LI Wei GUO Jian-hang
-
单位
煤炭科学技术研究院有限公司安全分院煤炭资源高效开采与洁净利用国家重点实验室(煤炭科学研究总院)
-
Organization
Mine Safety Technology Branch, China Coal Research Institute National Key Lab of Coal Resource High Efficient
Mining and Clean Uillization, China Coal Research Institute
-
摘要
为了准确确定穿层测压钻孔参数,以宏远煤矿15号煤层巷道及其高抽巷为原型,建立了穿层测压钻孔的几何模型,根据模型中穿层测压钻孔与倾斜煤层的空间层位关系,探讨了伪倾角对钻孔长度计算的影响,并得出钻孔长度和岩孔段长度计算的几何公式。基于Excel数据处理软件,编写穿层测压钻孔长度计算程序,发现理论长度与实际长度的误差不大于1 m,验证了计算公式的准确性,说明采用该计算公式可以提高设计效率和现场施工的准确性。
-
Abstract
In order to accurately determine the parameters of the pressure measuring borehole drilling through seam, based on No. 15 seam gateway and the high I
evel gas drainage gateway in Hongyuan Mine as a prototype, the geometrical model of the pressure measuring borehole drilling through the seam was established. Acc
ording to a space layer relationship between the pressure measuring borehole drilling through the seam and the inclined seam in the model, the paper discussed a false
inclination affected to the calculation of the borehole length and a geometrical formula to calculate the borehole length and the rock borehole length was obtained. Base
d on an Excel data processing software, a program to calculate the length of the pressure measuring borehole drilling through the seam was compiled and written.The P
rogram found that the error between the theoretical length and the actual length was less than 1 m. The accuracy of the calculation formula was verified and the applica
tion of the calculation formula could improve the design efficiency and the site construction accuracy.
-
关键词
高抽巷下行钻孔伪倾角钻孔参数
-
KeyWords
high level gas drainage gateway; downward drilling; false inclination; parameters of borehole;
-
基金项目(Foundation)
国家科技重大专项资助项目(2011ZX05063-009;2011ZX05040-001);