综放工作面开切眼掘进及其围岩稳定性控制技术
  • Title

    Open-Off Cut Excavation of Fully-Mechanized Top Coal Caving Mining Face and Stability Control Technology of Surrounding Rock

  • 作者

    刘明杰瞿群迪朱守颂鞠明和王琦

  • Author

    LIU Ming-jie Qu Qun-di ZHU Shou-song JU Ming-he WANG Qi

  • 单位

    中煤集团山西华昱能源有限公司中国矿业大学矿业工程学院

  • Organization
    Shanxi Huayu Energy Company Limited, China National Coal Group School of Mining Engineering, China
    University of Mining and Technology
  • 摘要
    为解决综放工作面开切眼掘进过程中围岩控制难度大的问题,利用FLAC3D软件对开切眼一次掘进(导硐)、二次掘进(扩宽)过程中围岩扰动情况进行数值模拟,对比分析其位移和应力特征。结果表明:一次掘进时巷道变形量不大,但随着二次掘进宽度的增加,巷道变形量不断增大;顶板变形量主要发生在二次掘进期间,且受二次掘进宽度的影响较大,二次掘进宽度越大,顶板变形量越大。据此提出采用"宽导窄扩"的掘进方式,该掘进方式对围岩的扰动破坏程度较低,通过在西沙河煤矿1901综放工作面开切眼进行工业性试验表明,顶底板最大移近量为98 mm,该掘进方式能有效控制开切眼围岩的变形破坏。
  • Abstract
    In order to solve a high dfficult control problem of surrounding rock in an open- off cut driving process of a fully- mechanized top coal caving mining fac e, the FLAC3 Dsoftware was applied to a numerical simulation on disturbance conditions of surrounding rock in a primary driving ( pilot gateway) and secondary driving ( reaming) of the open- off cut and the displacement and stress features were compared and analyzed. The results showed that the deformation value of the gateway in the primary driving was not high and with the width of the secondary driving increased, the deformation value of the gateway would be continuously increased. The defo rmation value of the roof would be occurred mainly during the secondary driving period. With a high influence of the secondary driving width, a larger width of the secon dary driving would have more deformation of the roof. Therefore, a wide pilot and narrow reaming driving method was provided and the driving method would have a mi n disturbance and failure to the surrounding rock. An industrial trial was conducted in an open- off cut of No. 1901 fully- mechanized top coal caving mining face in Xish ahe Mine and the trial showed that the max convergence between the roof and floor was 98 mm and the driving method could effectively control the deformation and fail ure of the open- off cut surrounding rock.
  • 关键词

    综放工作面开切眼掘进方式高地应力围岩稳定性

  • KeyWords

    flly-mechanized top coal caving mining face; open-off cut; driving method; high geostress; surrounding rock stability;