-
Title
Study on Mine Pressure Bumping Prevention and Control Technology of Coal Mining Face in Seam Island Based on Defect Method
-
作者
潘立友张若祥孔繁鹏
-
单位
山东科技大学采矿工程研究院山东科技大学资源与环境工程学院
-
摘要
针对孤岛工作面冲击地压事故频发的问题,通过在孤岛工作面高应力区域采用缺陷法防治冲击地压的技术,在孤岛工作面采用人为缺陷体转移应力场,在应力场转移过程中伴随着能量持续、缓慢的释放,并且能够形成卸压保护区,降低冲击地压危险性。采取卸压巷、爆破钻孔、大直径钻孔等人为缺陷技术方法,能够有效起到应力向工作面深部转移、能量释放的效果,并采用主动应力监测技术进行了效果检验。观测结果表明:通过缺陷体预先卸压,应力得到了有效降低与转移,工作面未出现应力积聚的现象。
-
Abstract
According to the problems of the mine pressure bumping accident frequently occurred in coal mining face in the seam island, the defect method was app
lied to prevent and control the mine pressure bumping in the high stress region of the coal mining face in the seam island, the artificial defect mass was applied to migr
ate the stress field of the coal mining face in the seam island, the energy continuously and slowly releasing could form a pressure releasing and protection zone during t
he stress filed migration process and thus the danger of the mine pressure bumping could be reduced.The pressure released gateway, blasting boreholes, large diamet
er boreholes and other artificial defect technical method applied could effectively make the stress migration forward to the deep of the coal mining face and could have
an energy released effect.An active stress monitoring and measuring technology was applied to the effect inspection.The observation results showed that based on the
artificial defect mass pressure pre-release, the pressure was decreased and migratied efficiently, the coal mining face didnOt appear the phenomenon of stress accumul
ation.
-
关键词
缺陷法孤岛工作面冲击地压应力转移
-
KeyWords
defect method;coal mining face in seam island;mine pressure bumping;stress migration;
-
基金项目(Foundation)
国家自然科学基金资助项目(51074101);山东省科技发展计划资助项目(2011GSF12010);
-
相关文章
-
相关专题