Title
Analysis of Surrounding Support and Stability on Gob-side Entry Retaining with Flexible- formwork Concrete in Shallow Seam
-
作者
张子飞贺安民
-
Author
ZHANG Zi-fei He An-min
-
单位
神华神东煤炭集团有限责任公司
-
Organization
Shenhua Shendong Coal Group Corporation Ltd.
-
摘要
结合榆家梁煤矿43308工作面柔模混凝土快速沿空留巷的工程实践,对浅埋深、薄基岩、快速推采的安全高效矿井沿空留巷支护形式和参数进行分析,巷旁采用柔模混凝土墙支护,巷内采用锚网索支护,并采用单体支柱配合长钢梁临时支护,在采空区侧采用木点柱和金属网挡矸支护,运用FLAC数值模拟研究了巷旁1 m厚混凝土墙压力分布。经过工作面沿空留巷矿压观测结果分析可知:沿空巷道围岩压力峰值滞后工作面60 m,最大值10 MPa;距工作面200 m后顶底板移近量达到稳定,最大值60 mm。实践表明浅埋煤层采用柔模混凝土进行沿空留巷支护,技术合理、沿空巷道稳定。
-
Abstract
Combined with rapid gob-side entry retaining engineering practice in No.43308 working face of Yujialiang Mine, this paper introduced gob-side entry reta
ining support form and parameters in shallow buried depth, thin bedrock, rapid mining, high output and efficiency mine:using flexible-formwork concrete wall as gob-side
support, using anchor-net-cable as roadway-in support;lagging temporary support by pillars and long beam, retraining gangue support by wood column and metal mesh,
and studying the pressure of concrete wall which being 1 meter thick in roadway-side.The mine pressure observation results of gob-side entry in No.43308 working face
showed that gob-side entry's peak pressure laged behind working face 60 m, the maximum was 10 MPa;gob-side entry along the roof and floor closer for the maximum
amount was 60 mm, to achieve stable after 200 m away from working face.The technology with flexible formwork concrete as gob-side entry retaining support in shallow
coal seam was reasonable and the effect was obvious.
-
关键词
沿空留巷柔模巷旁支护补强支护滞后支护
-
KeyWords
gob-side entry retaining; flexible-formwork; roadway-side support; supplement support; lagging temporary support;
-