• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
瓦斯抽采顺层钻孔新型封孔装置研究
  • Title

    Study on New Borehole Sealing Device of Gas Drainage Borehole Along Seam

  • 作者

    范付恒张福旺秦汝祥

  • Author

    FAN Fu-heng ZHANG Fu-wang QIN Ru-xiang

  • 单位

    平顶山天安煤业股份有限公司勘探工程处安徽理工大学能源与安全学院安徽理工大学煤矿安全高效开采省部共建教育部重点实验室

  • Organization
    Exploration Engineering Division, Pingdingshan Tian'an Coal Mining Group Company Limited School of Energy
    and Safety, Anhui University of Science and Technology Province and MOE Joint Established Key Lab of Mine
    Safety and High Efficient Mining, Anhui University of Science and Technology
  • 摘要
    针对现行瓦斯抽采钻孔封孔存在的封孔工艺繁琐、操作要求高、适用范围有限、抽采瓦斯浓度偏低、钻孔有效抽采周期短等技术难题,提出了采用新型封孔装置进行封孔,阐述了新型封孔装置的封孔的原理。对新型封孔装置+水泥浆封孔与聚氨酯+水泥浆封孔后的瓦斯抽采浓度进行了对比试验,试验结果表明:应用新型封孔装置+水泥浆封孔,单孔封孔仅需25 min,而聚氨酯+水泥浆封孔需55 min;封孔抽采48 d后,新型封孔装置+水泥浆封孔钻孔平均瓦斯体积分数在33%左右,远高出聚氨酯+水泥浆封孔钻孔抽采的瓦斯体积分数4%。新型封孔装置封孔工艺简单,封孔后钻孔抽采瓦斯浓度高、时间长,具有推广应用价值。
  • Abstract
    According to the complicated borehole sealing technique and high operation requirements existed in the available borehole sealing of the gas drainage, t he limited application scope, low gas drainage concentration, short effective gas drainage period of the borehole and other technical difficulties, a new borehole sealing device was applied to seal the borehole. The paper stated the borehole sealing principle of the new borehole sealing device. A comparison analysis was conducted on t he gas drainage concentrations between the new borehole sealing device + cement grout borehole sealing and the polyurethane + cement grout borehole sealing, the e xperiment results showed that with the application of the new borehole sealing device + cement grout borehole sealing, a single borehole sealing would only require 25 min and the polyurethane + cement grout borehole sealing would require 55 min for a single borehole. After 48 days of the borehole sealing and gas drainage, the aver age gas volume fraction of the new borehole sealing device + cement grout borehole sealing was about 33% and was higher than the gas volume fraction 4% drained fr om the polyurethane + cement grout sealing borehole. The borehole sealing technique of the new borehole sealing device was simple and after the borehole sealing, th e gas drainage concentration from the borehole would be high and the gas drainage time would be longer with a promotion and application value.
  • 关键词

    新型封孔装置瓦斯抽采钻孔水泥浆封孔

  • KeyWords

    new borehole sealing device; gas drainage; borehole; cement grout borehole sealing;

  • 相关文章
相关问题
立即提问

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联