• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
综采一次采全高顶板导水裂缝带发育高度研究
  • Title

    Study on Development Height of Water Flow Crack Zone in Roof Above Fully Mechanized One Passing Full Seam Mining Face

  • 作者

    李文生李文尹尚先

  • 单位

    西山煤电集团有限责任公司地测处中国矿业大学(北京)地球科学与测绘工程学院华北科技学院安全工程学院

  • 摘要
    为防治顶板水、防水煤柱留设而需合理确定顶板"三带"高度。以西山镇城底矿8煤为研究对象,采用井下仰孔注水测渗漏法和瞬变电磁法实测导水裂缝带高度,运用FLAC3D软件对上覆岩层的冒落、岩移规律进行了数值模拟。结果表明:数值模拟与现场实测得到的导水裂缝带基本一致,综合确定导水裂缝带高57.58 m,其中冒落带高16.32 m,裂缝带高41.26 m,说明《煤矿安全规程》中有关导水裂缝带统计经验公式不适用于中厚煤层综采一次采全高开采条件。
  • Abstract
    In order to prevent and contral the roof water,to leave the water prevention coal pillars,rationally set the height of the "three zones" in the roof,taking No. 8 seam in Chengdi Mine of Xishan Town as a study object,an underground mine water injection leakage measuring method with overhead borehole and a transient elect romagnetic method were applied to measure the height of the water flow crack zone.The FLAC3D software was applied to the numerical simulation on the roof falling of the overburden strata and the strata migration law.The results showed that the water flow crack zone height of the numerical simulation and the site measurement was basically the same.The water flow crack zone height was set as 57 .58 m,the falling zone height was 16.32 m and the crack zone height was 41.26 m.Thus the statistic e xperience formula of the water flow crack zone stipulated in Mine Safety Regulations would be not suitable for the mining conditions of the fully mechanized one passin g full seam mining face in the medium thick seam.
  • 关键词

    导水裂缝带注水测渗漏法瞬变电磁法数值模拟

  • KeyWords

    water flow crack zone;water injection leakage measuring method;transient electromagnetic method;numerical simulation;

  • 基金项目(Foundation)
    国家自然科学基金资助项目(51074075,41072188);“十二五”国家科技支撑计划资助项目(2012BAK04B00);河北省自然科学基金资助项目(E2012508001);
  • 相关文章
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联