-
Title
Study and Application of Stress Three-Dimensional Theory to Prevention and Control of Mine Pressure Bumping
-
作者
于正兴姜福兴桂兵张安元
-
单位
北京科技大学土木与环境工程学院亚利桑那大学兖矿集团有限公司济宁三号煤矿
-
摘要
基于欧拉小挠度理论建立了顶底板压杆稳定模型,煤层卸压将增加顶底板的临界载荷,增加顶底板发生冲击地压的可能性,以此提出了冲击地压治理的应力三向化理论,以济三煤矿163下00工作面为例,对冲击危险区采取了煤层卸压和爆破断底解危措施,通过钻孔窥视仪检验爆破断底的效果,观测孔发生变形、破裂或破碎,证明坚硬底板已经卸压,巷道围岩达到了应力三向化状态。工程实践表明,运用应力三向化理论对冲击危险巷道进行解危,可有效地防治冲击地压。
-
Abstract
Based on the Euler deflection theory, a roof and floor pressurized bar stabilization model was established .After the seam pressure released, the critical |
oad of the roof and floor would be increased and the possibility of the mine strata pressure bumping to be occurred would be increased.Therefore, a stress three dimen
sion theory was provided to control the mine pressure bumping.Taking No. 163B00 coal mining face in Jisan Mine as an example, the seam pressure releasing, the floor
broken with blasting and other danger releasing measures were taken to the mine pressure bumping danger area.With the bore fiberscope to inspect the floor broken ef
fect with blasting and to observe the deformation, breaking and broken of the borehole, it could be verified that the pressure of the hard floor was released and the gate
way surrounding rocks were in the stress three dimension status.The engineering practices showed that the stress three dimension theory applied to release the danger
of the mine pressure bumping danger gateway could be effectively to prevent and control the mine pressure bumping.
-
关键词
底板卸压冲击地压断底卸压应力三向化理论
-
KeyWords
floor pressure bumping;mine pressure bumping;pressure releasing with floor broken;stress three dimension theory;
-
基金项目(Foundation)
国家自然科学基金资助项目(50774012);国家重点基础研究发展计划(973计划)资助项目(2010CB226803);国家建设高水平大学公派研究生资助项目(留金[2009]3003);
-
相关文章