• 论文
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
大柳塔煤矿综采工作面压架冒顶机理研究
  • Title

    Study on mechanism of powered support jammed and roof falling in fully -mechanized coal mining face

  • 作者

    徐敬民朱卫兵鞠金峰

  • Author

    xu Jingmin Zhu Weibing Ju Jingfeng

  • 单位

    中国矿业大学深部煤炭资源开采教育部重点实验室中国矿业大学物联网(感知矿山)研究中心矿山互联网应用技术国家地方联合工程实验室

  • Organization
    MOE Key Lab of Deep Coal Resources Mining,China University of Mining and Technology Research Center ofInternet of Things ( Perception Mine) ,China University of Mining and Technology State and Province United Engineering Lab of Mine Internet Applied Technology
  • 摘要
    针对大柳塔煤矿52304综采工作面在回撤阶段发生的压架冒顶事故,采用现场实测、数值模拟和理论分析对事故的原因和防治对策进行研究。研究结果表明:因受特殊回撤工艺的影响,沿垂直于工作面方向布置的调节巷导致煤体应力集中系数过大,引发工作面与调节巷交叉处发生大面积片帮,最终因端面距超过临界值引发端面冒顶。同时破断块体因失去啮合力而大幅回转切落导致压架,并进一步恶化顶板状况,造成52304工作面在支架支撑力足够的情况下仍发生严重压架冒顶事故。由此确定了相应的防治对策,通过采用加强调节巷围岩的支护、优化回撤巷道的布置和选择非来压时期挂网等措施来预防事故的发生,并得到了52303工作面安全回撤的验证。
  • Abstract
    Accoding to the powered support jammed and roofalling accidents ocured in the face equipment remove stage ofNo.52304tuly-mechanized coal mining face in Dlita Mine, aite measurement umercal sinmulaton and theoretical analysis were appied to studly on accident causes and the prevenion and control counermeasures. The study resuts showed that ue to the infuences by the specal remove technique,the adjustment gateway set along the perpendicula to the coal mining face direction would cause the coal stress concentration coficient too high .and would cause lage area spalling occure at the cros section betwee the coal mtning face and the adiustment gateway and fnally due to the face front distance over the critical value would cause the roo falling at the face front area.Meanwihile du to the mesing fore lost, the broken rock blocks would highy rotate and cause the powered suppor anmed.Thus the roof conition would be further worse and under the suport resistance insuficient of the powered suppor in No.52304coal mining face serious powered support jammed and roo falig acidents ocured still Thevefore the relevant prevention and control countemeasures were proposed,the enhanced surounding rock suppor inthe adjustment gateway,the optimized layout of th face equipment remove gateway,the mesh pavement selected at the strata not pressurized period and othe measures were appietothe prevent and conrolof heaident occurrence.The equipment safety remove from No.52303 coal mining face was verified.
  • 关键词

    压架冒顶回撤通道煤壁片帮端面距调节巷

  • KeyWords

    powered support jammed and roof falling; recovery gateway; rib spalling;face front distance;adjustment gateway;

  • 基金项目(Foundation)
    国家重点基础研究发展计划(973计划)资助项目(2013CB227900);
  • 相关文章
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联