沿空掘巷综放开采卸压巷布置方式优化研究
  • Title

    Optimization study on pressure relief gateway layout for fully-mechanized top coal caving mining with gateway driven along goaf

  • 作者

    张伟顾士坦孙伟芳张强顾清恒贾光勇

  • Author

    Zhang Wei Gu Shitan Sun Weifang Zhang Qiang Gu Qingheng Jia Guangyong

  • 单位

    山东科技大学矿山灾害预防控制-省部共建国家重点实验室培育基地山东科技大学矿业与安全工程学院山东新巨龙能源有限责任公司

  • Organization
    State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province and Ministry of
    Science and Technology, Shandong University of Science and Technology School of Mining and Safety
    Engineering, Shandong University of Science and Technology Shandong Xinjulong Energy Company Limited
  • 摘要
    为了解决小煤柱沿空掘巷综放开采过程中沿空巷道矿压显现剧烈、变形严重的难题,采用本煤层布置卸压巷的方法对沿空巷道进行围岩控制,通过数值模拟方法研究了卸压巷在厚煤层的层位、卸压巷与沿空巷的巷道中心距、卸压巷的面积3个因素对卸压巷的卸压效果的影响,并对卸压巷的布置方式进行优化。结果表明:布置卸压巷降低了实体煤应力集中系数,减小应力集中区域面积,使应力集中向煤体深部转移,减小了沿空巷道围岩应力;最优化卸压巷布置方式是卸压巷在厚煤层中挑顶布置,巷道中心距为沿空巷道宽度的2.7~3.2倍,巷道尺寸与沿空巷道相同。该布置方式运用在现场,取得良好技术经济效益。
  • Abstract
    In order to solve difficult problems of serious mine strata behavior and serious deformation occurred in the gateway driven along the goaf during fully me chanized top coal caving mining process with small coal pillar gateway driven along the goaf, the pressure relief gateway layout method in mining seam was applied to surrounding rock control of the gateway driven along the goaf.The numerical simulation method was applied to study pressure relief gateway in layer location of thick se am, the central distance between pressure relief gateway and gateway retained along goaf and the dimension of pressure relief gateway factors affected to pressure rel ief effect of the pressure relief gateway.An optimization was conducted on the layout method of the pressure relief gateway.The results showed that layout of pressure「 elief gateway could reduce stress concentration coefficient of solid coal, and area of stress concentration block, could make stress concentration moving forward to dee p section of the seam and could reduce the surrounding rock stress of the gateway retained along the goaf.The best optimized layout method of pressure relief gateway was that pressure relief gateway should have a ripping layout in thick seam, the center distance of pressure relief gateway would be 2.7 ~ 3.2 times of width of gateway retained along the goaf and size of pressure relief gateway should be the same as gateway retained along the goaf.The layout method was applied to mine site with exc ellent technical and economic benefits.
  • 关键词

    沿空掘巷卸压巷巷道中心距巷道布置

  • KeyWords

    gateway driven along goaf; pressure relief gateway; center distance of gateway; gateway layout;

  • 基金项目(Foundation)
    国家自然科学基金资助项目(51274133;51374140);高等学校博士学科点专项科研基金资助项目(20123718110013);
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联